Minister Gatete made the promise as he inspected infrastructures in Southern Province.
The bridge collapsed in 2019 when a truck carrying sand fell off.
Minister Gatete said that the bridge is set to be renovated for residents to resume trade without disruptions.
“I visited the bridge this week to assess the situation. There is a path for pedestrians and motorcyclists but buses cannot cross it. This negatively impacts trade between Kamonyi and Ruhango,” he said.
Amb. Gatete revealed that the study the Engineering Brigade has completed the study of the project pending implementation which is expected in the near future under the budget being revised.
He assured that plans to rehabilitate more bridges are underway.

Leave a Reply