{"id":41576,"date":"2020-06-23T19:23:01","date_gmt":"2020-06-23T19:23:01","guid":{"rendered":"https:\/\/new.igihe.com\/govt-targets-to-connect-over-168-000-households-in-2020-21-fiscal-year\/"},"modified":"2020-06-25T08:41:39","modified_gmt":"2020-06-25T08:41:39","slug":"govt-targets-to-connect-over-168-000-households-in-2020-21-fiscal-year","status":"publish","type":"post","link":"https:\/\/new.igihe.com\/english\/govt-targets-to-connect-over-168-000-households-in-2020-21-fiscal-year\/","title":{"rendered":"Govt. Targets to connect over 168,000 households in 2020\/21 fiscal year"},"content":{"rendered":"<p>Minister Ndagijimana said construction of the Mamba-Rwabusoro-Rilima power line will continue, transmitting electricity that is generated from the Hakan power plant, located in Gisagara District. <\/p>\n<p>Construction of the Kigoma-Ngozi power grid that interconnects Rwanda-Burundi, and Shango power grid that interconnects Rusumo-Bugesera will continue. <\/p>\n<p>The government has also committed to providing electricity to 240 development sites and where important services are provided, including markets, educational institutions, and business centers.<\/p>\n<p>In the 2020\/21 budget, a project to provide electricity to the people across the country will be allocated Rwf 34.2 billion; the Kigoma-Ngozi power line project linking Rwanda and Burundi is worth Rwf9.9 billion.<\/p>\n<p>Also set on the agenda are a project to build a power line connecting Rwanda to the Democratic Republic of Congo worth Rwf5.5 billion and Mamba-Rwabusoro-Rilima power line project worth Rwf 13.3 billion<\/p>\n<p>Dr. Ndagijimana said that construction work on the KV 220 Mamba-Rwabusoro-Rilima power line with a length of 79.3 km and the 110 KV Bugesera-Gahanga power plant and its affiliates has reached 96.5%.<\/p>\n<p>He added that the construction of a 119-kilometer pipeline with a capacity of 220 KV for Rusumo-Bugesera-Shango construction work is completed at 50%.<\/p>\n<figure class=\"spip-document spip-document-35958 aligncenter\"><img decoding=\"async\" src=\"https:\/\/en-images.igihe.com\/jpg\/4-2133-5e61a.jpg\" alt=\"Minister Ndagijimana said construction of the Mamba-Rwabusoro-Rilima power line will continue, transmitting electricity that is generated from the Hakan power plant\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Government of Rwanda is targeting to have connected over 168,000 new households by the end of fiscal year 2020\/21, on both on and off-grid systems, the Minister of Finance and Economic Planning, Dr. Uzziel Ndagijimana has told Parliament.  <\/p>\n","protected":false},"author":103,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[75],"byline":[204],"hashtag":[],"class_list":["post-41576","post","type-post","status-publish","format-standard","hentry","category-news","tag-homenews","byline-elina-jonas-ruzindaza"],"bylines":[{"id":204,"name":"Elina Jonas Ruzindaza","slug":"elina-jonas-ruzindaza","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":103}],"contributors":[{"id":204,"name":"Elina Jonas Ruzindaza","slug":"elina-jonas-ruzindaza","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":103}],"featured_image":null,"_links":{"self":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/41576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/users\/103"}],"replies":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/comments?post=41576"}],"version-history":[{"count":0,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/41576\/revisions"}],"wp:attachment":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/media?parent=41576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/categories?post=41576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/tags?post=41576"},{"taxonomy":"byline","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/byline?post=41576"},{"taxonomy":"hashtag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/hashtag?post=41576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}