{"id":13392,"date":"2014-03-25T04:57:04","date_gmt":"2014-03-25T04:57:04","guid":{"rendered":"https:\/\/new.igihe.com\/zambezi-dam-could-collapse\/"},"modified":"2014-03-25T04:57:32","modified_gmt":"2014-03-25T04:57:32","slug":"zambezi-dam-could-collapse","status":"publish","type":"post","link":"https:\/\/new.igihe.com\/english\/zambezi-dam-could-collapse\/","title":{"rendered":"Zambezi Dam Could Collapse"},"content":{"rendered":"<p>{{In Zambia, the Zambezi River Authority has allayed fears that the Kariba Dam wall faces imminent collapse, saying it was in a stable state, while a series of rehabilitation works are required to avoid gradual degradation. }} <\/p>\n<p>ZRA\u2019s clarification came as Environment, Water and Climate Minister Saviour Kasukuwere and his Energy and Power Development counterpart Dzikamai Mavhaire are scheduled to meet  Zambian officials over the matter in Kariba today.<\/p>\n<p>In a statement yesterday, ZRA spokesperson Ms Elizabeth Karonga expressed regret over the misrepresentation of facts about the alleged impending collapse of the dam wall.<\/p>\n<p>\u201cWhile the situation at the Kariba Dam wall is cause for grave concern, the engineers on the ground have the situation under control,\u201d she said.<\/p>\n<p>\u201cThis does not translate to an immediate calamity. However, all urgency is expected in order to avert such catastrophe as dam failure.\u201d<br \/>\nZRA is a corporate body jointly owned by Zimbabwe and Zambia through bilateral agreements to co-manage the shared stretch of the Zambezi River and it has been managing Lake Kariba and its attendant infrastructure to facilitate and support hydro-power generation through the two countries\u2019 power utility companies.<\/p>\n<p>Ms Karonga attributed stories on the dam collapse to the co-operating partners\u2019 conference held early this year in Livingstone, Zambia, to mobilise funds for the Kariba Dam wall rehabilitation.<\/p>\n<p>She said the information denoted scenarios that could occur should ZRA fail to carry out maintenance and monitoring on the dam wall.<br \/>\n\u201cZRA carries out inspections and surveys twice a year on the Kariba Dam,\u201d she said.<\/p>\n<p>\u201cIn addition, every five years, a special safety inspection is undertaken with experts from France who were involved in the original design of the dam, with the last inspection having been undertaken in 2010.<\/p>\n<p>\u201cOther ad hoc inspections are conducted from time to time when required.\u201d<br \/>\nMs Karonga said several other instruments in the dam wall measure stress, changes or movement in the wall, water pressure and drainage.<\/p>\n<p>\u201cThese are continually inspected and have remained intact over the last 54 years,\u201d she said.<br \/>\n\u201cIn recent years, concern has been raised over the safety of the Kariba Dam wall, which was built over 50 years ago (and) the dam wall now requires a series of rehabilitation works in order to avoid gradual degradation of key dam safety features, while maintaining operation levels acceptable in accordance with international operating standards.\u201d<\/p>\n<p>Ms Karonga said ZRA had also identified undertaking critical dam maintenance programmes in its five year strategic plan (2010-2014) and these were being implemented, while a lasting solution was sought.<\/p>\n<p>She identified these as the plunge pool re-shaping, requiring stabilisation to limit scouring and erosion that could undermine the dam foundation, leading to dam failure.<\/p>\n<p>\u201cThere is also the spillway refurbishment that involves designing, fabrication and installation of an emergency gate and a new gantry to prevent uncontrolled loss of water in the event of floodgate failure, which would result in dropping water levels below minimum operational levels and interrupting power production.\u201d<\/p>\n<p>The programme, according to Ms Karonga, would also include the refurbishment of the upstream stop-beam guides and replacement of secondary concrete to prevent failure during operation of stop-beams.<\/p>\n<p>She said Zimbabwe and Zambia had appointed a resource mobilisation committee to ensure concerted resource mobilisation efforts for the critical works and other projects.<\/p>\n<figure class=\"spip-document spip-document-4874 aligncenter\"><img decoding=\"async\" src=\"https:\/\/en-images.igihe.com\/jpg\/eeesaq.jpg\" alt=\"\" \/><\/figure>\n<p>{herald}<\/p>\n","protected":false},"excerpt":{"rendered":"<p>{{In Zambia, the Zambezi River Authority has allayed fears that the Kariba Dam wall faces imminent collapse, saying it was in a stable state, while a series of rehabilitation works are required to avoid gradual degradation. }} ZRA\u2019s clarification came as Environment, Water and Climate Minister Saviour Kasukuwere and his Energy and Power Development counterpart [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2000051181,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[100],"byline":[170],"hashtag":[],"class_list":["post-13392","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-science-technology","tag-africa","byline-igihe"],"bylines":[{"id":170,"name":"IGIHE","slug":"igihe","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":8}],"contributors":[{"id":170,"name":"IGIHE","slug":"igihe","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":8}],"featured_image":{"id":2000051181,"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","alt":"","caption":"","mime_type":"image\/jpeg","width":0,"height":0,"sizes":{"thumbnail":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","width":1,"height":1},"medium":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","width":1,"height":1},"medium_large":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","width":1,"height":1},"large":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","width":1,"height":1},"full":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton13392.jpg","width":0,"height":0}}},"_links":{"self":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/13392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/comments?post=13392"}],"version-history":[{"count":0,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/13392\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/media\/2000051181"}],"wp:attachment":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/media?parent=13392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/categories?post=13392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/tags?post=13392"},{"taxonomy":"byline","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/byline?post=13392"},{"taxonomy":"hashtag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/hashtag?post=13392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}