{"id":10589,"date":"2013-09-24T23:38:32","date_gmt":"2013-09-24T23:38:32","guid":{"rendered":"https:\/\/new.igihe.com\/aggreko-aids-tunisia-to-meet-summer-power-demands\/"},"modified":"2013-09-24T23:38:29","modified_gmt":"2013-09-24T23:38:29","slug":"aggreko-aids-tunisia-to-meet-summer-power-demands","status":"publish","type":"post","link":"https:\/\/new.igihe.com\/english\/aggreko-aids-tunisia-to-meet-summer-power-demands\/","title":{"rendered":"Aggreko aids Tunisia to Meet Summer Power Demands"},"content":{"rendered":"<p>{{Aggreko has delivered a 120MW temporary power package to Tunisia in an attempt to consolidate and secure local power supplies during the summers}}<\/p>\n<p>The additional generation capacity was placed at strategic locations across the country for a period of two months to act as a back-up for the Tunisian grid.<\/p>\n<p>The Aggreko plants helped ensure a consistent and reliable power supply throughout the summer when energy demands were at their highest.<\/p>\n<p>The contract, awarded by the Soci\u00e9t\u00e9 Tunisienne d\u2019Electriciti\u00e9 et du Gas (STEG), saw Aggreko install four separate power plants of 30MW each at Enfida, Mateur, Bouficha and El Jem.<\/p>\n<p>Aggreko claimed that the solution has helped to ensure a continuous supply of power to major population and industrial areas, while also supporting key tourist centres vital to the Tunisian economy.<\/p>\n<p>Aggreko North and West Africa managing director Christophe Jacquin said, \u201cThis project highlights Aggreko\u2019s ability to not only provide large and complex power solutions to our customers but also our ability to do so both rapidly and for relatively short periods of time.<\/p>\n<p>\u201cThe tactical use of temporary power to address seasonal energy shortfalls is a valuable option for our large utility customers as it allows them to maintain critical supply while taking the steps to address the gaps in their generation and supply networks.\u201d<\/p>\n<p>Africanreview<\/p>\n","protected":false},"excerpt":{"rendered":"<p>{{Aggreko has delivered a 120MW temporary power package to Tunisia in an attempt to consolidate and secure local power supplies during the summers}} The additional generation capacity was placed at strategic locations across the country for a period of two months to act as a back-up for the Tunisian grid. The Aggreko plants helped ensure [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2000048451,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[100],"byline":[170],"hashtag":[],"class_list":["post-10589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-africa","byline-igihe"],"bylines":[{"id":170,"name":"IGIHE","slug":"igihe","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":8}],"contributors":[{"id":170,"name":"IGIHE","slug":"igihe","description":"","image":{"id":0,"url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&f=y&r=g","alt":"Default avatar","title":"Default avatar","caption":"","mime_type":"image\/jpeg","sizes":[]},"user_id":8}],"featured_image":{"id":2000048451,"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","alt":"","caption":"","mime_type":"image\/jpeg","width":0,"height":0,"sizes":{"thumbnail":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","width":1,"height":1},"medium":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","width":1,"height":1},"medium_large":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","width":1,"height":1},"large":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","width":1,"height":1},"full":{"url":"https:\/\/en-images.igihe.com\/IMG\/logo\/arton10589.jpg","width":0,"height":0}}},"_links":{"self":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/10589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/comments?post=10589"}],"version-history":[{"count":0,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/posts\/10589\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/media\/2000048451"}],"wp:attachment":[{"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/media?parent=10589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/categories?post=10589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/tags?post=10589"},{"taxonomy":"byline","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/byline?post=10589"},{"taxonomy":"hashtag","embeddable":true,"href":"https:\/\/new.igihe.com\/english\/wp-json\/wp\/v2\/hashtag?post=10589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}